Skip to content
LockridgeRoofing & Exteriors

exteriors

Siding in Canton, GA

Siding gets replaced for three reasons: it failed, it was damaged in the same storm as the roof, or it is the last thing making a good house look tired. We install fiber cement, vinyl and engineered wood, and on homes built before 1978 we work as an EPA Lead-Safe Certified Firm because federal law requires it.

A wall part-clad in fiber cement lap siding with house wrap still exposed at one end.

Filing on this? What we do and do not do in an insurance claim — including the one thing Georgia law does not allow anybody to offer you.

What we actually do on this job

Materials and systems

Fiber cement
The heaviest and the most dimensionally stable of the three, and the one that most often makes sense on a house where the original cladding lasted decades. Needs its clearances respected at grade and at the roof line or it wicks.
Engineered wood
Lighter than fiber cement, faster to install, and a genuine option where weight or structure is a constraint. Its warranty terms are specific about installation, which is a reason to care who installs it.
Vinyl
The least expensive and, installed properly, entirely serviceable. The failures we see are almost always installation rather than product: nailed tight instead of hung, no room to move, and no flashing where a roof meets a wall.

How it goes

  1. 01

    Find out what is behind it

    Most of what looks like a siding problem is a water-management problem, and the evidence is on the sheathing. We open a section before we quote where we can.

  2. 02

    Fix the water path first

    Wrap, flashing, kick-outs and clearances. New cladding over a wall that still lets water behind it is an expensive delay.

  3. 03

    Install, trim, and clean up properly

    On a pre-1978 home that cleanup is a regulated procedure rather than a courtesy, and it is part of the price.

My house was built in the seventies. What does that change?

It changes the rules, and it is worth knowing them because most homeowners do not. Federal renovation, repair and painting rules apply to housing built before 1978 when work disturbs painted surfaces — more than twenty square feet on an exterior — and window replacement and demolition of painted surfaces are covered regardless of square footage, with no floor at all. That is the detail most contractors miss. It means containment, specific work practices, cleanup, and a pamphlet delivered to you before work starts. Two more things worth saying plainly: Georgia runs its own program rather than the federal one, so a Georgia firm certifies with the state environmental agency, and the Census housing buckets everybody quotes are cut at 1979 rather than 1978 — so any "percentage of homes built before 1978" figure you read, including on other roofing sites, is an estimate rather than a statistic.

On homes built before 1978 we work as an EPA Lead-Safe Certified Firm, and the containment and cleanup that requires is priced into the job rather than added to it. What the rule requires →

Questions about siding

  • How long does a siding job take?
    Typically several days to a week on an average house, depending on size, how much of the sheathing needs replacing, and whether trim and soffit are in scope. Pre-1978 homes take longer because the containment and cleanup procedures are part of the work.
  • What changes the price?
    Square footage, the number of openings and corners, the material, whether there is more than one story, and what we find on the sheathing. Openings are the expensive part — a wall with six windows costs more per square foot than a blank gable.
  • Was my house built before 1978, and does it matter?
    It matters a lot, and the answer is on your county's property record rather than in anybody's brochure. Pre-1978 housing brings federal lead-safe work practices into scope whenever painted surfaces are disturbed — and a window replacement triggers them with no square-footage floor at all. We are set up to work that way and it is priced in, not added later.
  • Do I need a permit for siding?
    It depends on the jurisdiction, and some publish an exemption for exterior wall covering — unincorporated Cobb's list, for example, exempts siding, fascia and cornice work. That is a county rule and it does not carry inside a city's limits, so we check yours specifically.

Free inspection

Request an inspection window

Three steps — four if there has been a storm. About ninety seconds.

  1. Why you're calling
  2. When
  3. You
Why you are calling, and what kind of roof it is
What brings you to us?
Roughly how old is the roof?
How many stories?
A long run of finished architectural shingle roofline against a clearing storm sky.

Get on the roof and know for sure.

Forty-five minutes, dated photographs, a written answer, and no obligation of any kind.

CallFree inspection